Unlocking 24/7 solar
Pick a location
10 MW around the clock in Midland, TX
$84/MWh
≈ $90.0M build cost, spread over 30 yearsat 99% uptime
- Solar108 MW
- $54.1M
- Energy packs359 MWh · 31 h backup
- $35.9M
Why winter sets the size
In December, 1 MW of panels makes 2.5 MWh a day here in its last year, with 10.0 h of daylight. The array is sized so the darkest stretches still keep the load running; the rest of the year it makes more than needed.
Panels and batteries only. Simulated hour by hour on NREL NSRDB satellite data weather, 2005–2015, at 31.73°N 102.26°W, with losses and end-of-life aging: 99.00% uptime for a 99% target.
How we size it
To keep your load running 99% of the year, the system must get through the darkest month. Here, that's December, with the least sun and 14-hour nights. The rest of the year, it produces more than you need.
From 07:46 to 16:14 the sun alone runs your 10 MW and fills the batteries. Outside those hours, the batteries run the load. They hold 31 hours in total, so a cloudy day doesn't stop the load either.
An average December day in solar time. Cloudy days produce less; the extra panels and the battery buffer cover them.
Questions
Why is the solar array so much larger than the load?
Panels only produce during the day, and winter days are short and cloudy. The array has to cover the whole day's load in the darkest month, so it produces far more than needed in summer.
What happens on a cloudy day?
The panels keep generating, only less. Whatever they can't cover, the batteries take over. At 99% the batteries alone can run your full 10 MW for about 31 hours, then recharge when the sun returns.
What is included in the price?
Installed solar and AstraQ energy packs at the $/W and $/kWh in advanced settings.
How is it calculated?
We simulate every hour of 11 years of NREL satellite weather (2005–2015, about 4 km resolution) at your site, with heat, wiring and battery losses, and with the panels and batteries aged to the last year of the project. For each array size we find the smallest battery that meets your uptime, then pick the cheapest pair at your prices.